DigiCo Sydney SYD2 — Artarmon Data Center

DigiCo Sydney SYD2 (iseek GH) is a data center operated by DigiCo in Artarmon, NSW, AU. The facility is currently operational.

Status
Operational
Market
Artarmon
State
NSW
Country
AU

Market intelligence

AVOID

Sydney

Full DCPI breakdown →

Market context

DigiCo Sydney SYD2 (iseek GH) is one of 223 facilities DC Hub’s Sydney brief counts on the AEMO grid. The closest tracked facility is 5GN North Sydney Data Centre (NSDC), under 1 km away. Read the Sydney market brief →

Location

Area Artarmon, NSW, AU

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

LocationArtarmon, AU

Fiber connectivity

Networks recorded as present at or immediately around DigiCo Sydney SYD2 (iseek GH) in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.

5G NetworksAPCSAXONVXAussie BroadbandCentorrino TechnologiesDalegroup Pty LtdEncooIPNG Transit AllianceIntergridKinetix NetworksKinetix Networks - AustraliaMegaport Global Access

Further networks are recorded at this location beyond those listed here.

Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.

Power generation nearby

DC Hub tracks 45 operating generating units totalling 373 MW within about 50 km of Artarmon, AU. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas216 MW · 2 units · 58%
Utility-Scale Solar136 MW · 42 units · 37%
Bioenergy21 MW · 1 unit · 6%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Nearest first, by distance from this site.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="digico-digico-sydney-syd2-iseek-gh-6d23cde2" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind