DATA4 - MAD1

Data4
📍

DATA4 - MAD1 is a data center operated by Data4. It sits in the Madrid data-center market on the ENTSOE-ES grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 68.8-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Coordinates
40.5341, -3.6480

Market intelligence

AVOID

Data Center Power Index verdict for Madrid — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Madrid — the market this facility sits in (full deep-dive →).

Madrid's data center footprint spans 114 tracked facilities totaling 75 MW across a fragmented operator base, with Digital Realty commanding the largest single presence at four sites. Equinix maintains dual operations under separate legal entities Equinix, Inc. and Equinix contributing three facilities each, while mid-tier players including Asociación ESpanix and Colt Technology Services Madrid each operate two to three sites. The market remains substantially smaller than comparable European hubs, with average facility density suggesting greenfield or conversion-stage development rather than mature consolidation. The DCPI verdict of AVOID reflects a critical structural misalignment: excess-power availability at 32/100 paired against infrastructure constraints scoring 63/100 signals severe undersupply relative to demand. For acquisition-focused buyers, this combination is deeply…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketMadrid
Grid operatorENTSOE-ES
DC Hub Power IndexAVOID
Est. time to power68.8 months

Power generation nearby

DC Hub tracks 55 operating generating units totalling 625 MW within about 50 km of this location. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Utility-Scale Solar519 MW · 52 units · 83%
Oil/Gas77 MW · 2 units · 12%
Bioenergy29 MW · 1 unit · 5%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Get all 20,100+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON