Data Center 1457383500 is a data center in US. The facility is currently operational. It sits in the The Woodlands data-center market on the ERCOT grid, which DC Hub's Data Center Power Index currently rates BUILD, with an estimated 29.5-month time-to-power. For operators evaluating new capacity, this market screens favorably — grid headroom and interconnection timelines are comparatively strong.
Data Center Power Index verdict for The Woodlands — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on The Woodlands — the market this facility sits in (full deep-dive →).
The Woodlands data center market remains nascent, with only 5 tracked facilities totaling 0 MW of operational capacity across a fragmented operator base dominated by two unnamed players, one other unnamed operator, and Stream Data Centers. The market shows zero recent M&A activity, indicating either early-stage development or structural barriers to institutional investment. Despite minimal current infrastructure, the DCPI scoring—excess power at 65/100 paired with moderate constraint at 40/100—signals latent demand and accessible utility capacity. The BUILD verdict reflects a asymmetric risk-reward profile attractive to greenfield developers and operators willing to speculate on anchor tenants. The 65/100 excess-power score indicates CenterPoint Energy's substantial pipeline—the utility has committed to energizing up to 8GW of data center load across Greater Houston by 2029—creates…
Published DC Hub data for this location.
DC Hub tracks 1 operating generating unit totalling 180 MW within about 50 km of US. Generation mix shapes both carbon profile and interconnection options for a site at this location.
Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.
get_facility slug="data-center-1457383500-bfafa682" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect