CyrusOne NJ-1 is a data center operated by CyrusOne in Somerset, NJ, US. The facility is currently operational. It sits in the Somerset data-center market on the PJM grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 10.7-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Somerset — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Somerset — the market this facility sits in (full deep-dive →).
Somerset's data center footprint consists of 15 tracked facilities totaling 500 MW, concentrated among a fragmented operator base dominated by CyrusOne with four facilities across the market. The portfolio shows moderate scale but lacks strategic consolidation, with the majority operator category remaining "Unknown" at five properties. No recent M&A activity has been recorded in the market, signaling either stability or dormancy depending on regional dynamics. Power availability remains the critical constraint: the excess-power score of 34/100 indicates tight supply conditions, while the constraint rating of 37/100 signals meaningful grid infrastructure limitations that will shape deployment economics. The DCPI verdict of AVOID carries direct implications for acquisition and greenfield investment strategies. A constraint score of 37/100 means power infrastructure cannot reliably support…
Published DC Hub data for this location.
DC Hub tracks 277 operating generating units totalling 15,882 MW within about 50 km of Somerset, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.
Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.
Comparable facilities in Somerset tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="cyrusone-cyrusone-nj-1-99f98401" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=cyrusone-cyrusone-nj-1-99f98401