Crusoe North Dakota 1 is a data center operated by Crusoe Energy in Williston, ND, US. The facility is currently operational. It sits in the Williston, ND data-center market on the MISO grid, which DC Hub's Data Center Power Index currently rates BUILD, with an estimated 8.4-month time-to-power. For operators evaluating new capacity, this market screens favorably — grid headroom and interconnection timelines are comparatively strong.
Data Center Power Index verdict for Williston, ND — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Williston, ND — the market this facility sits in (full deep-dive →).
Williston's data center market remains nascent, with just 40 MW across two tracked facilities—a footprint dwarfed by regional peers but strategically positioned within North Dakota's energy corridor. The market's excess-power score of 71/100 reflects substantial uncommitted generation capacity, while its constraint rating of 17/100 signals minimal transmission and real estate bottlenecks. This configuration—ample stranded power, minimal operational friction—creates the textbook conditions for greenfield development that the DCPI framework rewards with a BUILD verdict. The 71/100 excess-power rating is the operative signal here. Unlike Boston 29/100, excess power or Edmonton insufficient scale, Williston possesses genuine power surplus at the regional grid level, primarily derived from oil-and-gas flare gas monetization and wind generation. For buyers and operators, this means two…
Published DC Hub data for this location.
Comparable facilities in Williston tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="crusoe-energy-crusoe-north-dakota-1-689a6545" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=crusoe-energy-crusoe-north-dakota-1-689a6545