CoreSite SV1 is a data center operated by CoreSite in San Jose, CA, US. It carries a reported power capacity of 25.0 MW and is currently operational. It sits in the San Jose data-center market on the CAISO grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 45.4-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.
Data Center Power Index verdict for San Jose — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on San Jose — the market this facility sits in (full deep-dive →).
San Jose's data center footprint spans 66 tracked facilities totaling 585 MW, positioning it as a meaningful secondary market within the Bay Area corridor. Equinix dominates operator share with 11 facilities across its branded entities, while CoreSite and Stack each operate 4 and 3 facilities respectively, leaving a fragmented tail of smaller players. The market has not recorded recent M&A activity, distinguishing it from the consolidation momentum seen in peer markets like San Antonio and the Bay Area's broader acquisition cycles. The CAUTION verdict—driven by excess-power scoring of 66/100 paired with constraint at 56/100—signals a market in transition rather than acute distress. This combination indicates San Jose has moderate supply cushion but faces real infrastructure headwinds that will shape entry timing. Unlike Dublin's AVOID verdict driven by critical power scarcity at 24/100,…
Published DC Hub data for this location.
Comparable facilities in San Jose tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="coresite-sv1-san-jose-82bc2e6f" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect