COPT NV-1 is a data center operated by COPT in Sterling, VA, US. It carries a reported power capacity of 28.0 MW and is currently operational. It sits in the Sterling data-center market on the PJM grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 39.0-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Sterling — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Sterling — the market this facility sits in (full deep-dive →).
Sterling hosts 155 tracked facilities representing 2,766 MW of operational capacity, positioning it as a significant regional hub. AWS maintains the largest operator footprint with 46 facilities, followed by two operators each controlling 16 MW of capacity. The market has attracted institutional capital, evidenced by TA Realty's recent 10-acre land acquisition at $6.1 million per acre, signaling continued confidence in Sterling's long-term development potential despite near-term constraints. The DCPI verdict of AVOID is driven by a critical mismatch between supply and demand fundamentals: excess power rates 45/100 indicating tight availability while infrastructure constraints score 53/100 moderate-to-severe limitations. This dual-constraint profile eliminates traditional acquisition strategies that depend on unutilized power capacity or expandable grid connections. Unlike Washington,…
Exact location not on record.
Published DC Hub data for this location.
Comparable facilities in Sterling tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="copt-copt-nv-1-7ff05061" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect