Cogent Chicago 3

Cogent Chicago 3 is a data center operated by Cogent Communications, Inc. in Chicago, IL, US. The facility is currently operational. It sits in the Chicago data-center market on the PJM grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 36.0-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
Market
Chicago
State
IL
Country
US

Market intelligence

AVOID

Data Center Power Index verdict for Chicago — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Chicago — the market this facility sits in (full deep-dive →).

Chicago's data center footprint spans 302 tracked facilities totaling 1,563 MW, establishing it as a material Midwest hub, yet the market presents a paradoxical constraint profile that demands careful operator positioning. Digital Realty commands market leadership with 17 facilities, followed by NTT and an unnamed operator each holding 6 assets, while Centersquare and CyrusOne round out the top five with 5 facilities apiece. The fragmentation across a relatively concentrated operator base—with the top player controlling roughly 6% of tracked capacity—suggests neither monopolistic pricing power nor sufficient density for aggressive consolidation plays. The DCPI verdict of 44/100 excess-power paired with 50/100 constraint represents a market in equilibrium but without slack: excess capacity exists, yet the constraint score signals operational and possibly transmission limitations that…

Location

Area Chicago, IL, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketChicago
Grid operatorPJM
Data Center Power IndexAVOID
Est. time to power36.0 months
LocationChicago, US
Nearest substationwithin 1 km

Power generation nearby

DC Hub tracks 111 operating generating units totalling 12,876 MW within about 50 km of Chicago, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas10,920 MW · 72 units · 85%
Nuclear1,885 MW · 2 units · 15%
Utility-Scale Solar71 MW · 37 units · 1%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Chicago tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="cogent-communications-inc-cogent-chicago-3-e1593cd3" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind