Cloudnium Phoenix (Tempe)

Last updated

Cloudnium Phoenix (Tempe) is a data center operated by Cloudnium LLC in Tempe, AZ, US.

City
Tempe
State
AZ
Country
US

Source: PeeringDB · Verified against PeeringDB · Basis: cited (what this means)

What changed

Changes DC Hub has recorded to this facility’s record, newest first.

Market intelligence

BUILD

Tempe

Power outlook → Tempe market page →

Market context

Cloudnium Phoenix (Tempe) is one of 11 facilities DC Hub’s Tempe brief counts on the WECC grid. The closest tracked facility is Omnis Network, under 1 km away. Read the Tempe market brief →

Location

Area Tempe, AZ, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

LocationTempe, US

Power generation nearby

DC Hub tracks 57 operating generating units totalling 4,978 MW within about 50 km of Tempe, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas4,731 MW · 34 units · 95%
Utility-Scale Solar130 MW · 20 units · 3%
Hydropower117 MW · 3 units · 2%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Nearest first, by distance from this site.

Unlock power scores for this site → Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP over Streamable HTTP at https://dchub.cloud/mcp; call execute_plan with this page's question for one dated, cited answer. You can also query get_facility slug="cloudnium-llc-cloudnium-phoenix-tempe-c4d2785b". Source: DC Hub (dchub.cloud), as of [the as_of date on the result]. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind