CleanArc Virginia Campus Expansion +300MW

CleanArc
📍 VA, US

Virginia Campus Expansion +300MW is a data center operated by CleanArc in VA, US. It carries a reported power capacity of 300.0 MW and is currently planned. It sits in the Chantilly data-center market on the PJM grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 20.9-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Power
300.0 MW
Status
Planned
State
VA
Country
US
Coordinates
38.9072, -77.4369
Address
Virginia

Market intelligence

AVOID

Data Center Power Index verdict for Chantilly — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Chantilly — the market this facility sits in (full deep-dive →).

Chantilly's 300 MW installed base across 25 tracked facilities represents a mature but constrained Northern Virginia cluster. AWS dominates with 12 MW of tracked capacity two separate operator entries, while H5 Data Centers operates 4 MW and an unknown operator controls another 4 MW. The market shows minimal recent consolidation activity—no tracked M&A transactions—suggesting either market saturation or depressed valuations that have discouraged deal flow. The DCPI verdict of AVOID reflects structural headwinds that should deter acquisition-focused capital. An excess-power score of 47/100 indicates Chantilly lacks the spare capacity premium that attracts incremental colocation demand; the constraint rating of 56/100 signals meaningful but not severe infrastructure limitations. This combination penalizes buyers seeking either rapid utilization ramp or substantial expansion optionality.…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketChantilly
Grid operatorPJM
DC Hub Power IndexAVOID
Est. time to power20.9 months
Reported capacity300.0 MW

Power generation nearby

DC Hub tracks 85 operating generating units totalling 4,637 MW within about 50 km of US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas4,119 MW · 13 units · 89%
Utility-Scale Solar297 MW · 67 units · 6%
Bioenergy221 MW · 5 units · 5%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in VA tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 20,100+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="cleanarc-virginia-campus-expansion-300mw-09d38ea7" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=cleanarc-virginia-campus-expansion-300mw-09d38ea7
Schema, units and the population behind every count: https://dchub.cloud/bind