Citynet Bridgeport is a data center operated by Citynet in Bridgeport, WV, US. It carries a reported power capacity of 3.0 MW and is currently operational. It sits in the Appalachia (Retiring Coal) data-center market on the PJM grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 7.2-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.
Data Center Power Index verdict for Appalachia (Retiring Coal) — the market this facility sits in.
Full DCPI breakdown →Published DC Hub data for this location.
Comparable facilities in Bridgeport tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="citynet-citynet-bridgeport-420b8104" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=citynet-citynet-bridgeport-420b8104