Citynet Bridgeport

Citynet Bridgeport is a data center operated by Citynet in Bridgeport, WV, US. The facility is currently operational. It sits in the Appalachia (Retiring Coal) data-center market on the PJM grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 7.2-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.

Status
Operational
Market
Bridgeport
State
WV
Country
US

Market intelligence

CAUTION

Data Center Power Index verdict for Appalachia (Retiring Coal) — the market this facility sits in.

Full DCPI breakdown →

Location

Area Bridgeport, WV, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketAppalachia (Retiring Coal)
Grid operatorPJM
Data Center Power IndexCAUTION
Est. time to power7.2 months
LocationBridgeport, US
Nearest substationwithin 5 km

Fiber connectivity

Networks recorded as present at or immediately around Citynet Bridgeport in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.

Citynet

Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.

Power generation nearby

DC Hub tracks 12 operating generating units totalling 4,803 MW within about 50 km of Bridgeport, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Coal4,108 MW · 7 units · 86%
Oil/Gas522 MW · 1 unit · 11%
Wind98 MW · 1 unit · 2%
Hydropower51 MW · 1 unit · 1%
Utility-Scale Solar24 MW · 2 units · 1%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Bridgeport tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="citynet-citynet-bridgeport-420b8104" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind