Cibicom Datacenter Ballerup

Cibicom Datacenter Ballerup is a data center operated by Cibicom A/S in Ballerup, Capital Region of Denmark, DK. The facility is currently operational. It sits in the Copenhagen data-center market on the NORDPOOL grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 24.3-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
Market
Ballerup
State
Capital Region of Denmark
Country
DK

Market intelligence

AVOID

Data Center Power Index verdict for Copenhagen — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Copenhagen — the market this facility sits in (full deep-dive →).

Copenhagen's data center market remains undersized and infrastructure-constrained, with 70 tracked facilities totaling 28 MW across a fragmented operator base. Digital Realty leads with 5 facilities, followed by an unnamed operator with 4, Telia Copenhagen with 2, and single-asset holders Amazon Web Services and AtlasEdge. The market has experienced no tracked M&A activity in the recent period, indicating minimal consolidation momentum and limited secondary-market liquidity for investors seeking exits or portfolio optimization. The DCPI verdict of AVOID reflects a structurally problematic risk-reward profile for acquisition-focused capital. While excess-power scores 49/100—suggesting marginal surplus capacity—the constraint component registers 51/100, indicating meaningful headroom limitations that will restrict future expansion and tenant onboarding. This combination creates a pincer…

Location

Area Ballerup, Capital Region of Denmark, DK

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketCopenhagen
Grid operatorNORDPOOL
Data Center Power IndexAVOID
Est. time to power24.3 months
LocationBallerup, DK

Fiber connectivity

Networks recorded as present at or immediately around Cibicom Datacenter Ballerup in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.

31173 ServicesASERGOAdeo DCAkamai TechnologiesAmazon.comAnexiaApallas ApSApple Inc.Arelion (Twelve99)BOLIG∙NET A/SBTBahnhof

Further networks are recorded at this location beyond those listed here.

Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.

Power generation nearby

DC Hub tracks 57 operating generating units totalling 2,378 MW within about 50 km of Ballerup, DK. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Bioenergy1,267 MW · 10 units · 53%
Oil/Gas664 MW · 9 units · 28%
Wind258 MW · 9 units · 11%
Utility-Scale Solar189 MW · 29 units · 8%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="cibicom-as-cibicom-datacenter-ballerup-05e25efd" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind