成都超算中心 is a data center in Chengdu, CN. The facility is currently operational.
The closest tracked facility is GDS Chengdu CD1, about 20 km away.
Published DC Hub data for this location.
DC Hub tracks 16 operating generating units totalling 1,458 MW within about 50 km of Chengdu, CN. Generation mix shapes both carbon profile and interconnection options for a site at this location.
Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.
Nearest first, by distance from this site.
get_facility slug="cheng-du-chao-suan-zhong-xin-433b1c13" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect