Cgi Montreal is a data center in Montreal, CA. The facility is currently announced. It sits in the Montréal data-center market on the HQ grid, which DC Hub's Data Center Power Index currently rates BUILD, with an estimated 8.4-month time-to-power. For operators evaluating new capacity, this market screens favorably — grid headroom and interconnection timelines are comparatively strong.
Data Center Power Index verdict for Montréal — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Montréal — the market this facility sits in (full deep-dive →).
Montréal's data center market is moderately developed with 320 MW distributed across 110 tracked facilities, positioning it as a meaningful but not oversaturated regional hub. Cologix holds the largest single presence with 11 facilities, followed by Vantage Data Centers with 9 facilities; the market shows healthy operator diversity with no single player controlling more than 10% of tracked capacity. The presence of 110 tracked facilities—compared to Monroe's 3 or nascent Québec City—indicates an established ecosystem with multiple tiers of operators serving both hyperscale and mid-market demand. The DCPI verdict of BUILD is driven by a critical imbalance: excess-power scores 66/100 while constraint rates only 31/100, meaning available electrical capacity significantly outpaces physical space and infrastructure bottlenecks. For acquisition-stage investors, this signals a buyer's market.…
Published DC Hub data for this location.
Comparable facilities in Montreal tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="cgi-montreal-7dc58e69" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=cgi-montreal-7dc58e69