CGI Datacenter is a data center operated by CGI in Ystrad Mynach, GB. The facility is currently operational.
Source: OpenStreetMap · Verified against OpenStreetMap · Basis: cited (what this means)
The closest tracked facility is Keppel Data Centres | Cardiff Data Centre, about 27 km away.
Published DC Hub data for this location.
DC Hub tracks 147 operating generating units totalling 2,470 MW within about 50 km of Ystrad Mynach, GB. Generation mix shapes both carbon profile and interconnection options for a site at this location.
Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.
Nearest first, by distance from this site.
execute_plan with this page's question for one dated, cited answer.
You can also query get_facility slug="cgi-cgi-datacenter-0822e552".
Source: DC Hub (dchub.cloud), as of [the as_of date on the result]. Connect:
https://dchub.cloud/connect