Centersquare Tampa (TPA1) is a data center operated by Centersquare in Tampa, FL, US. It carries a reported power capacity of 3.0 MW and is currently operational. It sits in the Tampa data-center market on the FRCC grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 17.3-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Tampa — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Tampa — the market this facility sits in (full deep-dive →).
Tampa's data center footprint remains modest at 65 MW across 34 tracked facilities, with Flexential commanding the largest operational presence through nine facilities Flexential and Flexential Corp. combined. The market is concentrated—the top five operators control the majority of deployed capacity—and shows no material consolidation activity in recent quarters. The region sits within Florida's broader data center corridor, though regulatory and development headwinds have constrained growth; a small facility was proposed in adjacent Pinellas Park, and American Tower filed plans for a 4 MW edge deployment outside Tampa at a cell tower site, yet major proposals have faced rejection. The DCPI verdict of AVOID reflects a dual constraint: excess-power availability at 42/100 signals tight supply relative to demand, while a constraint score of 46/100 indicates structural barriers to…
Published DC Hub data for this location.
Comparable facilities in Tampa tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="centersquare-centersquare-tampa-tpa1-081a4da9" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=centersquare-centersquare-tampa-tpa1-081a4da9