Centersquare Minneapolis MSP1 — Shakopee Data Center

Centersquare Minneapolis (MSP1) is a data center operated by Centersquare in Shakopee, MN, US. The facility is currently operational. It sits in the Eden Prairie data-center market on the MISO grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 17.8-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
Market
Shakopee
State
MN
Country
US

Market intelligence

AVOID

Data Center Power Index verdict for Eden Prairie — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Eden Prairie — the market this facility sits in (full deep-dive →).

Eden Prairie remains a nascent, undersized market with no operational capacity. Three tracked facilities operate across the metro area, but collectively host 0 MW of deployed infrastructure—a stark contrast to peer markets like Minneapolis 95 MW across 89 facilities and Elk Grove Village 125 MW across 31 facilities. The operator landscape is fragmented, split among EdgeConneX represented twice under different entity names and OneNeck IT Solutions LLC. This fragmentation, combined with zero live capacity, signals an early-stage or stalled development cycle rather than a functioning data center hub. The DCPI verdict—excess-power rated 45/100 and constraint at 40/100, landing in AVOID territory—reflects structural unfavorability for new entrants and expansions. An excess-power score of 45 indicates inadequate or uncertain power supply infrastructure relative to demand, a critical barrier…

Location

Area Shakopee, MN, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketEden Prairie
Grid operatorMISO
Data Center Power IndexAVOID
Est. time to power17.8 months
LocationShakopee, US
Nearest substationwithin 1 km

Fiber connectivity

Networks recorded as present at or immediately around Centersquare Minneapolis (MSP1) in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.

ArvigCogent Communications, Inc.

Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.

Power generation nearby

DC Hub tracks 173 operating generating units totalling 3,992 MW within about 50 km of Shakopee, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas3,600 MW · 15 units · 90%
Utility-Scale Solar284 MW · 151 units · 7%
Bioenergy100 MW · 3 units · 3%
Wind7 MW · 4 units · 0%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Shakopee tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="centersquare-centersquare-minneapolis-msp1-dcd1047b" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind