Centeris SH2 Build-to-Suit

Centeris SH2 Build-to-Suit is a data center in Puyallup, WA. The facility is currently operational. It sits in the Puyallup data-center market on the WECC grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 16.7-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.

Status
Operational
City
Puyallup
State
WA
Coordinates
47.1589, -122.2799
Address
39th Avenue Southeast

Market intelligence

CAUTION

Data Center Power Index verdict for Puyallup — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Puyallup — the market this facility sits in (full deep-dive →).

Puyallup's data center footprint remains nascent, with 7 tracked facilities totaling 0 MW of operational capacity. The market is fragmented across five operators, with Centeris holding the strongest position through two separate assets one standard facility and one build-to-suit property, while ScaleMatrix Holdings, IsoFusion/Colocation Northwest, and two unidentified operators each maintain single-asset presence. The market has experienced no recorded M&A activity to date, indicating either stability among existing operators or a lack of institutional investor interest—likely the latter given the market's developmental stage. The DCPI verdict of CAUTION reflects a market caught between competing constraints. The excess-power score of 53/100 signals moderate but not abundant power availability, while the constraint rating of 43/100 suggests meaningful infrastructure limitations remain.…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketPuyallup
Grid operatorWECC
DC Hub Power IndexCAUTION
Est. time to power16.7 months

Power generation nearby

DC Hub tracks 8 operating generating units totalling 815 MW within about 50 km of Puyallup. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas496 MW · 3 units · 61%
Hydropower183 MW · 4 units · 22%
Wind136 MW · 1 unit · 17%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Get all 20,100+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="centeris-sh2-build-to-suit-centeris-sh2-build-to-suit-472fa37f" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=centeris-sh2-build-to-suit-centeris-sh2-build-to-suit-472fa37f
Schema, units and the population behind every count: https://dchub.cloud/bind