CapitaLand Ascendas REIT CapitalLand - Croyden

CapitaLand Ascendas REIT
📍 GB

CapitalLand - Croyden is a data center operated by CapitaLand Ascendas REIT in GB. It sits in the London data-center market on the NGESO grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 201.6-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Country
GB
Coordinates
51.3846, -0.1374
Address
CR0 4GN, GB

Market intelligence

AVOID

Data Center Power Index verdict for London — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on London — the market this facility sits in (full deep-dive →).

London's colocation market is severely constrained by power availability despite moderate physical capacity. The tracked estate spans 415 facilities totaling 916 MW across five dominant operators, yet the DCPI excess-power score of 16/100 signals acute scarcity in available power allocation, while the constraint rating of 77/100 indicates structural grid and real-estate bottlenecks that will not resolve near-term. Digital Realty holds the largest footprint at 20 facilities, followed by Equinix 17, DataBank 16, Telehouse 11, and a significant Unknown operator portfolio 13 sites, fragmenting operator leverage and complicating bulk expansion. For acquisition-focused investors, the DCPI verdict is unambiguous: AVOID. The 77/100 constraint score eliminates the operational flexibility required to justify M&A at current valuations. Buyers pursuing London capacity will face structural power…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketLondon
Grid operatorNGESO
DC Hub Power IndexAVOID
Est. time to power201.6 months

Power generation nearby

DC Hub tracks 70 operating generating units totalling 3,010 MW within about 50 km of GB. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas2,253 MW · 8 units · 75%
Bioenergy380 MW · 10 units · 13%
Utility-Scale Solar351 MW · 46 units · 12%
Wind26 MW · 6 units · 1%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Get all 20,100+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="capitaland-ascendas-reit-capitalland-croyden-7feab567" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=capitaland-ascendas-reit-capitalland-croyden-7feab567
Schema, units and the population behind every count: https://dchub.cloud/bind