Bridge DC Johor 1 is a data center operated by Bridge Data Centres in Johor, MY. It carries a reported power capacity of 60.0 MW and is currently operational. It sits in the Johor data-center market on the TNB grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 10.8-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Johor — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Johor — the market this facility sits in (full deep-dive →).
Johor's operational base comprises 8 tracked facilities totaling 63 MW, concentrated among five operators with Bridge Data Centres holding the largest footprint at two sites. The market has attracted major institutional capital, most notably a $175 million IFC commitment to AirTrunk for facility expansion and completion. Recent pipeline activity includes Digital Halo's 20 MW facility coming online and DDSP's 45 MW project reportedly pre-leased to a hyperscale customer and backed by $283 million in financing, signaling confidence in underlying demand despite modest operational scale. The DCPI verdict of AVOID carries specific weight for acquisition-focused investors. An excess-power score of 43/100 indicates that deployed capacity faces utilization headwinds—facilities cannot reliably absorb incremental load without material operational or pricing concessions. Coupled with a constraint…
Published DC Hub data for this location.
Comparable facilities in Johor tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="bridge-data-centres-bridge-dc-johor-1-0980046a" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=bridge-data-centres-bridge-dc-johor-1-0980046a