Datacenter BNP Paribas Marne Est 2

Datacenter BNP Paribas Marne Est 2 is a data center operated by BNP Paribas in Ferrières-en-Brie, FR. It carries a reported power capacity of 5.0 MW and is currently operational.

Power
5.0 MW
Status
Operational
Market
Ferrières-en-Brie
Country
FR

Market intelligence

AVOID

Paris

Full DCPI breakdown →

Market context

In the Paris market on the ENTSOE-FR grid, Datacenter BNP Paribas Marne Est 2’s 5 MW is about 1% of the 356 MW DC Hub’s brief counts there. The closest tracked facility is BNP Paribas (Hello Bank!), under 1 km away. Read the Paris market brief →

Location

Area Ferrières-en-Brie, FR

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

LocationFerrières-en-Brie, FR
Reported capacity5.0 MW

Power generation nearby

DC Hub tracks 63 operating generating units totalling 2,089 MW within about 50 km of Ferrières-en-Brie, FR. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas1,427 MW · 11 units · 68%
Utility-Scale Solar296 MW · 32 units · 14%
Wind220 MW · 16 units · 11%
Bioenergy147 MW · 4 units · 7%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Nearest first, by distance from this site.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="bnp-paribas-datacenter-bnp-paribas-marne-est-2-0e461e84" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind