Ayera Technologies, Inc. 801 Tenth Street Modesto (Ayera)

801 Tenth Street Modesto (Ayera) is a data center operated by Ayera Technologies, Inc. in Modesto, CA, US. The facility is currently operational. It sits in the Modesto data-center market on the CAISO grid, which DC Hub's Data Center Power Index currently rates CAUTION, with an estimated 38.0-month time-to-power. The market shows mixed signals — validate live grid headroom and queue depth before committing capacity.

Status
Operational
Market
Modesto
State
CA
Country
US

Market intelligence

CAUTION

Data Center Power Index verdict for Modesto — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Modesto — the market this facility sits in (full deep-dive →).

Modesto's data center footprint remains nascent, with only 3 tracked facilities totaling 0 MW of operational capacity. The market is fragmented across three operators—Ayera Technologies, Inc., Volt Broadband, and Yosemite Community College District—each managing a single asset. No recent M&A activity has been recorded, indicating a dormant transaction environment and limited competitive consolidation to date. The DCPI verdict of CAUTION reflects a mixed risk profile that demands selective rather than opportunistic entry. With an excess-power score of 62/100 and a constraint score of 51/100, Modesto presents asymmetric exposure: adequate power availability sits alongside moderate grid and infrastructure constraints. For acquisition-focused buyers, this combination signals neither the acute scarcity that justifies premium valuations nor the oversupply that enables distressed acquisitions.…

Location

Area Modesto, CA, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketModesto
Grid operatorCAISO
Data Center Power IndexCAUTION
Est. time to power38.0 months
LocationModesto, US
Nearest substationwithin 1 km

Fiber connectivity

Networks recorded as present at or immediately around 801 Tenth Street Modesto (Ayera) in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.

Ayera TechnologiesCVINVolt Broadband

Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.

Power generation nearby

DC Hub tracks 49 operating generating units totalling 2,459 MW within about 50 km of Modesto, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas1,712 MW · 16 units · 70%
Utility-Scale Solar340 MW · 27 units · 14%
Hydropower300 MW · 1 unit · 12%
Bioenergy103 MW · 3 units · 4%
Wind3 MW · 2 units · 0%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Modesto tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="ayera-technologies-inc-801-tenth-street-modesto-ayera-d9192be7" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind