Amazon IAD115 is a data center operated by AWS. The facility is currently operational. It sits in the Dulles data-center market on the PJM grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 32.0-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Dulles — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Dulles — the market this facility sits in (full deep-dive →).
The Dulles market comprises 210 MW across 10 tracked facilities, with AWS operating three sites and establishing dominant market presence. Power availability remains the primary constraint: the excess-power DCPI score of 48/100 indicates tight remaining capacity, while the constraint score of 52/100 signals that grid and infrastructure limitations are acute. This 52-point constraint reading places Dulles in the same structural bind as nearby Herndon 53/100 constraint and Chantilly 56/100 constraint—the Northern Virginia corridor is uniformly power-constrained despite strong demand. For acquisition-focused investors, the AVOID verdict reflects straightforward economics: assets in Dulles lack the operational flexibility that typically justifies premium valuations. With constraint scores above 50/100, buyers inherit infrastructure bottlenecks that limit revenue expansion. New capacity…
Published DC Hub data for this location.
DC Hub tracks 74 operating generating units totalling 1,638 MW within about 50 km of this location. Generation mix shapes both carbon profile and interconnection options for a site at this location.
Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.
get_facility slug="aws-amazon-iad115-649fcc9d" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=aws-amazon-iad115-649fcc9d