AVAIO Digital Taurus (Brandon Campus)

AVAIO Digital Taurus (Brandon Campus) is a data center operated by AVAIO Digital in Brandon, MS, US. It carries a reported power capacity of 150.0 MW and is currently under construction. It sits in the Brandon data-center market on the MISO grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 12.1-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Power
150.0 MW
Status
Under Construction
Market
Brandon
State
MS
Country
US

Market intelligence

AVOID

Data Center Power Index verdict for Brandon — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Brandon — the market this facility sits in (full deep-dive →).

Brandon presents a constrained, power-limited market with minimal near-term opportunity for new entrants or expansion. The market contains just 150 MW of tracked capacity across a single operational facility, operated by AVAIO Digital. The DCPI scoring—excess-power at 43/100 and constraint at 29/100—reflects a market where available electrical infrastructure cannot reliably support incremental demand, creating a structural ceiling on growth. The AVOID verdict is justified by Brandon's constraint score of 29/100, which signals that local utility capacity, transmission interconnection timelines, or distribution infrastructure present material obstacles to facility development or expansion. For buyers evaluating acquisition targets or greenfield deployment, this means utility interconnection delays, higher soft costs for infrastructure upgrades, and extended timelines to operational…

Location

Area Brandon, MS, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketBrandon
Grid operatorMISO
Data Center Power IndexAVOID
Est. time to power12.1 months
LocationBrandon, US
Reported capacity150.0 MW
Nearest substationwithin 5 km

Power generation nearby

DC Hub tracks 5 operating generating units totalling 829 MW within about 50 km of Brandon, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas551 MW · 1 unit · 66%
Utility-Scale Solar278 MW · 4 units · 34%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Brandon tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="avaio-digital-avaio-digital-taurus-brandon-campus-a48d5c7a" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind