Atruvia AG GAD-Rechenzentrum 2

Münster, DE

GAD-Rechenzentrum 2 is a data center operated by Atruvia AG in Münster, DE. Its reported power capacity falls in the under 10 MW range and it is currently operational.

Power
under 10 MW
Status
Operational
Market
Münster
Country
DE

Source: OpenStreetMap · Added , not re-checked since · Basis: cited (what this means)

Market context

The closest tracked facility is 1&1 Versatel Telehaus Münster, about 7 km away.

Location

Area Münster, DE

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

LocationMünster, DE
Reported capacityunder 10 MW

Power generation nearby

DC Hub tracks 258 operating generating units totalling 8,182 MW within about 50 km of Münster, DE. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas3,308 MW · 19 units · 40%
Coal3,150 MW · 5 units · 39%
Wind1,128 MW · 66 units · 14%
Utility-Scale Solar473 MW · 163 units · 6%
Bioenergy122 MW · 5 units · 1%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Nearest first, by distance from this site.

Unlock power scores for this site → Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP over Streamable HTTP at https://dchub.cloud/mcp; call execute_plan with this page's question for one dated, cited answer. You can also query get_facility slug="atruvia-ag-gad-rechenzentrum-2-8a06f725". Source: DC Hub (dchub.cloud), as of [the as_of date on the result]. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind