Asosiasi Penyelenggara Jasa Internet Indonesia APJII Kepri

APJII Kepri is a data center operated by Asosiasi Penyelenggara Jasa Internet Indonesia in Kota Batam, Kepri, ID. The facility is currently operational. It sits in the Batam data-center market on the PLN-BATAM grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 21.5-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
Market
Kota Batam
State
Kepri
Country
ID

Market intelligence

AVOID

Data Center Power Index verdict for Batam — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Batam — the market this facility sits in (full deep-dive →).

Batam's data center market remains underdeveloped, with only six tracked facilities totaling 450 MW across a fragmented operator base. The market's excess-power score of 36/100 signals structural oversupply relative to demand absorption capacity, while the constraint score of 44/100 indicates moderate but unresolved infrastructure bottlenecks—likely around grid reliability, cooling, or interconnection capacity. No significant M&A activity has materialized in the tracked period, contrasting sharply with adjacent Indonesian markets where consolidation and foreign capital entry are accelerating. The AVOID verdict reflects a fundamental mismatch between supply trajectories and revenue certainty. With excess-power scoring below 40, investors face an environment where utilization rates struggle to justify infrastructure deployment costs. For acquisition-focused buyers, this signals that entry…

Location

Area Kota Batam, Kepri, ID

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketBatam
Grid operatorPLN-BATAM
Data Center Power IndexAVOID
Est. time to power21.5 months
LocationKota Batam, ID

Fiber connectivity

Networks recorded as present at or immediately around APJII Kepri in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.

3D TechBUANA LINTAS MEDIACipta Informatika CemerlangMatrix Cable International Exchange (MCIX)MedialinkNAP Info IPT MAXNAP Info IPTransitNAP Info InternetPGAS TELEKOMUNIKASI NUSANTARA AS56258Sumber Data Indonesia NAPWaluya Istana NusantaracdnIX

Further networks are recorded at this location beyond those listed here.

Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.

Power generation nearby

DC Hub tracks 150 operating generating units totalling 19,320 MW within about 50 km of Kota Batam, ID. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas18,464 MW · 53 units · 96%
Bioenergy438 MW · 7 units · 2%
Utility-Scale Solar288 MW · 88 units · 1%
Coal130 MW · 2 units · 1%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="asosiasi-penyelenggara-jasa-internet-indonesia-apjii-kepri-f02e6c99" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind