Asosiasi Penyelenggara Jasa Internet Indonesia APJII Jabar

APJII Jabar is a data center operated by Asosiasi Penyelenggara Jasa Internet Indonesia in Kota Bandung, Jawa Barat, ID. The facility is currently operational. It sits in the Jakarta data-center market on the PLN grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 33.5-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
Market
Kota Bandung
State
Jawa Barat
Country
ID

Market intelligence

AVOID

Data Center Power Index verdict for Jakarta — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Jakarta — the market this facility sits in (full deep-dive →).

Jakarta's data center market comprises 135 tracked facilities delivering 860 MW of aggregate capacity, split relatively evenly between excess-power availability 46/100 and operational constraints 50/100—a configuration that creates structural friction for new entrants. The operator landscape is fragmented, with PDG, BDx DC Services Limited, and NTT DATA's Global Data Centers division each operating three facilities, while Digital Realty maintains two. The absence of recent M&A activity signals either saturation at current valuations or hesitation among institutional buyers given the market's mixed signals. The DCPI verdict of AVOID carries material weight for acquisition-focused investors. A constraint score of 50/100—exactly at the inflection point between manageable and problematic—paired with only moderate excess-power availability 46/100 means the market lacks both the capacity…

Location

Area Kota Bandung, Jawa Barat, ID

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketJakarta
Grid operatorPLN
Data Center Power IndexAVOID
Est. time to power33.5 months
LocationKota Bandung, ID

Fiber connectivity

Networks recorded as present at or immediately around APJII Jabar in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.

ADSNET (ads.net.id)AFNALINKARIF_AWALUDINArjuna Global Teknologi IndonesiaArta Flash SintesaArtha Media Lintas NusaArthaloka NetworksAtharvaBITSNETIDBina Solusi SejahteraCitra Jelajah InformatikaComtronics Systems

Further networks are recorded at this location beyond those listed here.

Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.

Power generation nearby

DC Hub tracks 25 operating generating units totalling 3,288 MW within about 50 km of Kota Bandung, ID. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Hydropower1,943 MW · 4 units · 59%
Geothermal818 MW · 11 units · 25%
Utility-Scale Solar400 MW · 6 units · 12%
Coal127 MW · 4 units · 4%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Kota Bandung tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="asosiasi-penyelenggara-jasa-internet-indonesia-apjii-jabar-f80afb3d" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind