Arkansas Research and Education Optical Network (AREON) ARE-ON Forrest City

ARE-ON Forrest City is a data center operated by Arkansas Research and Education Optical Network (AREON) in Forrest City, AR, US. The facility is currently operational. It sits in the Memphis data-center market on the TVA grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 10.5-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
Market
Forrest City
State
AR
Country
US

Market intelligence

AVOID

Data Center Power Index verdict for Memphis — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Memphis — the market this facility sits in (full deep-dive →).

Memphis operates 33 data center facilities across 5,600 MW of total capacity, dominated by xAI's seven-site footprint, with DataBank, EdgeConneX, and CenturyLink Memphis each maintaining smaller regional presences. The market's excess-power score of 35/100 signals meaningful capacity glut—supply outpaces near-term demand absorption—while a constraint rating of 26/100 reflects limited infrastructure bottlenecks that might otherwise support premium pricing or scarcity-driven investment returns. This combination creates a buyer's market with downward pressure on unit economics. The DCPI verdict to AVOID reflects a structural mismatch between supply and demand that makes acquisition or greenfield deployment economically unattractive for institutional investors. With excess power available at 35/100, new entrants face immediate commoditization risk and weak pricing leverage. Operators…

Location

Area Forrest City, AR, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketMemphis
Grid operatorTVA
Data Center Power IndexAVOID
Est. time to power10.5 months
LocationForrest City, US
Nearest substationwithin 5 km

Fiber connectivity

Networks recorded as present at or immediately around ARE-ON Forrest City in public peering records. Treat this as a map of who is there, not as a list of contracted cross-connects — availability, diversity and pricing are the operator’s to confirm.

Arkansas Research and Education Optical Network (AREON)

Source: PeeringDB carrier-to-facility records, matched to this site by location. A network listed here may sit in a neighbouring hall or an adjacent building at the same address, so presence is reported for the location rather than for a single suite.

Power generation nearby

DC Hub tracks 8 operating generating units totalling 842 MW within about 50 km of Forrest City, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Utility-Scale Solar698 MW · 7 units · 83%
Wind144 MW · 1 unit · 17%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Forrest City tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="arkansas-research-and-education-optical-network-areon-are-on-forrest-city-3258d5d8" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind