Apollo Cable Landing Station

Apollo Cable Landing Station is a data center operated by Apollo in Wall, NJ, US. It carries a reported power capacity of 5.0 MW and is currently operational. It sits in the Edison data-center market on the PJM grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 16.8-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Power
5.0 MW
Status
Operational
Market
Wall
State
NJ
Country
US

Market intelligence

AVOID

Data Center Power Index verdict for Edison — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Edison — the market this facility sits in (full deep-dive →).

The Edison market currently hosts 8 tracked facilities totaling 0 MW of operational capacity, with fragmented operator control split primarily between Iron Mountain 2 facilities and four other smaller players. This near-zero baseline reflects either recent facility decommissioning, early-stage development, or data gaps in the tracked portfolio—none of which signals market maturity. The operator landscape remains shallow: two unknown entities, one independent facility, Iron Mountain Data Centers, and NJ 1 DATA CENTER together form the current supply base, indicating minimal consolidation and no clear market leader. The DCPI verdict of AVOID—driven by excess-power constraint 34/100 and operational constraint 32/100—carries direct implications for acquisition-focused capital. An excess-power score of 34/100 means Edison's grid cannot reliably absorb additional capacity without…

Location

Area Wall, NJ, US

Approximate area (about 1 km)

Market & grid context

Published DC Hub data for this location.

MarketEdison
Grid operatorPJM
Data Center Power IndexAVOID
Est. time to power16.8 months
LocationWall, US
Reported capacity5.0 MW
Nearest substationwithin 1 km

Power generation nearby

DC Hub tracks 148 operating generating units totalling 4,790 MW within about 50 km of Wall, US. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Oil/Gas4,243 MW · 13 units · 89%
Utility-Scale Solar492 MW · 133 units · 10%
Bioenergy56 MW · 2 units · 1%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Wall tracked by DC Hub — compare power, operators, and grid context across the market.

Get the full global facility map + power scores & site-selection tools — DC Hub from $49 → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="apollo-apollo-cable-landing-station-cd69626f" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect
Schema, units and the population behind every count: https://dchub.cloud/bind