George C. Wallace Alabama Supercomputer Center is a data center operated by Alabama Supercomputer Authority in Huntsville, AL, US. The facility is currently operational. It sits in the Huntsville data-center market on the SOCO grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 32.2-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Huntsville — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Huntsville — the market this facility sits in (full deep-dive →).
Huntsville operates as a constrained mid-tier market with 10 tracked facilities totaling 94 MW across a fragmented operator base. The market's excess power score of 29/100 signals severe power availability limitations relative to demand, while the constraint score of 53/100 indicates material friction across land, interconnect, and cooling infrastructure. SimpleHelix holds the largest position with two facilities, followed by Meta and Meta Platforms with three combined assets, creating a landscape dominated by hyperscaler and specialized operators rather than regional players. The AVOID verdict reflects a market fundamentally misaligned with expansion-stage capital deployment. A constraint score of 53/100 places Huntsville in the problematic middle band—too constrained for greenfield builds or large-scale additions, yet not commoditized enough to justify acquisition multiples. The…
Published DC Hub data for this location.
Comparable facilities in Huntsville tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="alabama-supercomputer-authority-george-c-wallace-alabama-supercomputer-center-240eaffb" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=alabama-supercomputer-authority-george-c-wallace-alabama-supercomputer-center-240eaffb