Air France B4

Air France

B4 is a data center operated by Air France in Antibes, FR. The facility is currently operational. It sits in the Marseille data-center market on the ENTSOE-FR grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 28.8-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.

Status
Operational
Market
Antibes
Country
FR
Coordinates
43.6270, 7.0325

Market intelligence

AVOID

Data Center Power Index verdict for Marseille — the market this facility sits in.

Full DCPI breakdown →

Market context

DC Hub analyst read on Marseille — the market this facility sits in (full deep-dive →).

Marseille hosts 42 tracked facilities totaling 66 MW, but faces critical grid and power constraints that undermine near-term investment appeal. Digital Realty operates the largest footprint with 8 facilities, followed by Orange with 2 sites, while the remaining 32 facilities are fragmented among smaller operators including Asp Serveur La Ciotat, Colt Technology Services Marseille, and Aix-Marseille Université. The market's geographic position as a Mediterranean hub and sovereign data center presence—highlighted in regional infrastructure discourse—offers strategic value, yet this advantage is offset by immediate operational headwinds that constrain supply expansion. The DCPI verdict of AVOID reflects a market in structural strain. With an excess-power score of 29/100 and constraint score of 58/100, Marseille signals acute power availability and grid connection challenges that will…

Location

Open in OpenStreetMap →

Market & grid context

Published DC Hub data for this location.

MarketMarseille
Grid operatorENTSOE-FR
DC Hub Power IndexAVOID
Est. time to power28.8 months
LocationAntibes, FR

Power generation nearby

DC Hub tracks 28 operating generating units totalling 350 MW within about 50 km of Antibes, FR. Generation mix shapes both carbon profile and interconnection options for a site at this location.

Hydropower220 MW · 4 units · 63%
Utility-Scale Solar130 MW · 24 units · 37%

Source: Global Energy Monitor unit inventory, operating units only. Counts are units, not plants.

Other data centers nearby

Comparable facilities in Antibes tracked by DC Hub — compare power, operators, and grid context across the market.

Get all 20,100+ facilities + power scores & site-selection tools — DC Hub from $49/mo → Full capacity report Free MCP key (AI agents) Used by Claude & Cursor
Data: DC Hub global infrastructure database · Raw JSON
Live grid, fiber & DCPI context for this facility — AI agents: query DC Hub MCP get_facility slug="air-france-b4-946b2b1a" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect: https://dchub.cloud/connect?src=page-onramp&entity=air-france-b4-946b2b1a
Schema, units and the population behind every count: https://dchub.cloud/bind