AiNET WDC11 is a data center operated by AiNET in Laurel, MD, US. It carries a reported power capacity of 3.0 MW and is currently operational. It sits in the Laurel data-center market on the PJM grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 8.5-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Laurel — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Laurel — the market this facility sits in (full deep-dive →).
Laurel is a severely undercapitalized market with just 3 MW across three fragmented operators. The market's 34/100 excess-power score reflects acute power supply constraints, placing it among the most power-starved submarkets in the mid-Atlantic. Current tracked infrastructure consists of one facility each operated by AiNET, an unnamed operator, and one additional player—a distribution pattern typical of early-stage or transitional markets with no dominant anchor tenant. The absence of recent M&A activity compounds the picture: no consolidation, no institutional capital inflow, and no signals of near-term supply expansion. The DCPI verdict of AVOID carries unambiguous implications for acquisition-focused investors. The 30/100 constraint score indicates severe limitations across land, interconnection density, and utility infrastructure—issues that cannot be remedied quickly or cheaply.…
Published DC Hub data for this location.
Comparable facilities in Laurel tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="ainet-ainet-wdc11-db742260" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=ainet-ainet-wdc11-db742260