1101 Stewart Ave, Garden City is a data center in Garden City, NY, US. It carries a reported power capacity of 3.0 MW and is currently operational. It sits in the Garden City data-center market on the NYISO grid, which DC Hub's Data Center Power Index currently rates AVOID, with an estimated 22.2-month time-to-power. Operators should weigh interconnection risk here — the market screens constrained on grid headroom and time-to-power.
Data Center Power Index verdict for Garden City — the market this facility sits in.
Full DCPI breakdown →DC Hub analyst read on Garden City — the market this facility sits in (full deep-dive →).
Garden City's data center footprint remains modest but operationally stressed. Four tracked facilities totaling 206 MW are distributed across a fragmented operator base, with Applied Digital commanding the largest presence via two sites. The market's excess-power DCPI score of 41/100 indicates significant unutilized generation capacity, while the constraint score of 46/100 signals non-trivial infrastructure bottlenecks—likely grid interconnection, transmission, or real estate limitations that prevent ready power deployment. The dual-constraint profile yields a clear AVOID verdict for acquisition-focused investors. Excess power alone would suggest opportunity, but the constraint reading disqualifies it. Buyers cannot assume they'll monetize idle generation: the market lacks sufficient interconnection bandwidth or buildable land to absorb incremental tenant demand at acceptable unit…
Published DC Hub data for this location.
Comparable facilities in Garden City tracked by DC Hub — compare power, operators, and grid context across the market.
get_facility slug="1101-stewart-ave-garden-city-b493fb76" (endpoint https://dchub.cloud/mcp) for the full cited record. Connect:
https://dchub.cloud/connect?src=page-onramp&entity=1101-stewart-ave-garden-city-b493fb76