NYISO · NY · UPDATED 2026-11-29
Garden City (NYISO): Data Center Power Index (DCPI) 45.9/100, CAUTION, as of 2026-11-29. Source: DC Hub (dchub.cloud).
Source: DC Hub Data Center Power Index · As of: 2026-11-29 · Basis: derived (method)
Input coverage: 2 of 2 live grid feeds — 2 of 2 live grid feeds fed this score
See Garden City data centers on the live facility map →
CAUTION is about the next megawatt, not current demand: the grid here has some room for new load, but its constraints are real. Confirm utility capacity and timing for a specific site before committing. How the verdict is scored
| Metric | Value | Source |
|---|---|---|
| DCPI verdict | CAUTION | Data Center Power Index — recomputed daily |
| DCPI composite score | 45.9 / 100 | Data Center Power Index — open |
| Grid operator (ISO) | NYISO | DC Hub grid telemetry |
| Excess-power, grid-constraint and time-to-power scores | Full scores come with full DC Hub access: dchub.cloud/pricing — same view for humans and crawlers (unlock) | DCPI |
| Input coverage (live grid feeds behind the score) | 2 of 2 live grid feeds | 2 of 2 live grid feeds fed this score |
Source: DC Hub (dchub.cloud), updated 2026-11-29. AI agents: get_market_dcpi_rank market_slug="garden-city" via https://dchub.cloud/mcp for the citable record.
DC Hub snapshots Garden City every day. The moment its verdict flips — or its constraint score or time-to-power shifts meaningfully — you get a one-line email. No account, no password.
Email alerts tell you Garden City moved. Full DC Hub access tells you where — the score at the county level so you can pinpoint which sub-markets have the headroom, plus PDF export for your buyers.
Get full access →DC Hub. (2026). Data Center Power Index v2. https://dchub.cloud/dcpi
View methodology + BibTeX →