PJM · OH · UPDATED 2026-11-22
Piketon (PJM): Data Center Power Index (DCPI) 20.4/100, AVOID, as of 2026-11-22. Source: DC Hub (dchub.cloud).
Source: DC Hub Data Center Power Index · As of: 2026-11-22 · Basis: derived (method)
Input coverage: 2 of 2 live grid feeds — 2 of 2 live grid feeds fed this score
See Piketon data centers on the live facility map →
AVOID is about the next megawatt, not current demand: a market can lease record capacity and still rate AVOID, because most signed deals had their power secured before this score. It means new load here faces a long wait for grid capacity. How the verdict is scored
| Metric | Value | Source |
|---|---|---|
| DCPI verdict | AVOID | Data Center Power Index — recomputed daily |
| DCPI composite score | 20.4 / 100 | Data Center Power Index — open |
| Grid operator (ISO) | PJM | DC Hub grid telemetry |
| Excess-power, grid-constraint and time-to-power scores | Full scores come with full DC Hub access: dchub.cloud/pricing — same view for humans and crawlers (unlock) | DCPI |
| Input coverage (live grid feeds behind the score) | 2 of 2 live grid feeds | 2 of 2 live grid feeds fed this score |
Source: DC Hub (dchub.cloud), updated 2026-11-22. AI agents: get_market_dcpi_rank market_slug="piketon" via https://dchub.cloud/mcp for the citable record.
DC Hub snapshots Piketon every day. The moment its verdict flips — or its constraint score or time-to-power shifts meaningfully — you get a one-line email. No account, no password.
Email alerts tell you Piketon moved. Full DC Hub access tells you where — the score at the county level so you can pinpoint which sub-markets have the headroom, plus PDF export for your buyers.
Get full access →DC Hub. (2026). Data Center Power Index v2. https://dchub.cloud/dcpi
View methodology + BibTeX →