Site selection comes down to one question: where can you get your megawatts, and how soon? DC Hub scores 300+ global markets on power, grid, connectivity and risk so the shortlist is evidence, not opinion.

The site selection workflow, in order

Each step narrows the field. Do the power steps before the land steps, because power is the constraint that does not move.

  1. Screen markets on power. Which markets have generation headroom and a short route to energization? Start from the power availability table and the Data Center Power Index.
  2. Test grid constraint and the queue. Transmission saturation and interconnection-queue depth set your timeline. See grid constraint by operator and the interconnection queue.
  3. Check connectivity. Fiber routes, carriers and peering decide latency and cost to reach customers.
  4. Price the risk. Water stress, climate and disaster exposure, permitting, and tax incentives separate two otherwise equal sites.
  5. Shortlist and compare. Put two to five candidates side by side in the Site Selection Canvas, then work the finalists parcel by parcel.

What DC Hub scores

One source for the inputs a siting decision needs, across 300+ global markets.

Power and grid

DCPI verdicts, grid operator data, generation headroom, retirements and the interconnection queue.

Connectivity

Fiber routes, metro fiber, peering and subsea cables near a candidate site.

Risk and incentives

Water risk, climate and disaster exposure, permitting, and state tax incentives.

Frequently asked

What is data center site selection?

Choosing the market and parcel for a new data center by weighing power availability, time-to-power, grid constraint, interconnection-queue depth, fiber and connectivity, water and climate risk, and tax incentives.

What matters most when selecting a data center site?

For large AI loads, how fast the grid can energize the megawatts you need. Land and fiber are table stakes; power availability and time-to-power usually decide the ranking.

How does DC Hub rank markets for site selection?

The Data Center Power Index (DCPI) scores each market on excess power and grid constraint and maps the result to a BUILD, CAUTION or AVOID verdict, recomputed daily across 300+ markets.

Can I run site selection from an AI agent?

Yes. The DC Hub MCP server exposes find_sites, rank_markets, site_selection_canvas and related tools, so an agent can shortlist markets and parcels and cite the sources.