For research teams

The Capacity Tracker:
hyperscale, neocloud and AI capacity, monthly.

A monthly spreadsheet of every data-center campus and phase that the world's hyperscalers, neoclouds and AI companies have operating, under construction or announced, with the month each one comes online. Built for sell-side and buy-side analysts.

Request a proposal and sample The Energy Report → The Power Contracts Tracker →

This is a research dataset. To buy or lease data-center capacity, register your requirement on Capacity Source; to list capacity you have, see list your site.

What you get

Three buckets, global

Hyperscale: Microsoft, Amazon (AWS), Google, Meta, Oracle, plus Apple, ByteDance, Alibaba and Tencent where public sources allow. Neocloud: CoreWeave, Nebius, Crusoe, Lambda, Nscale, IREN, Fluidstack and other GPU clouds above 50 MW. AI: OpenAI, Anthropic, xAI, Mistral and other model developers with dedicated capacity. Others on request.

Leased capacity, counted once

Capacity a company rents is credited to the company that uses it, and shown as supply under the company that provides it. If a hyperscaler leases from a neocloud, the MW appears in the tenant's total and in the provider's supply, and the grand total counts it once.

Monthly Excel, CSV and change log

Every release ships as an Excel workbook, CSV files and a change log in the first business week of each month. Campuses and phases of 20 MW or more, plus any smaller site a company has announced itself.

What each monthly release contains

TabContent
SummaryOperating MW and MW coming online, by company and by bucket, by month and quarter
Coming onlineMonth-by-month schedule for the next 24 months, from developers' stated targets
Changes this monthNew sites, upsized or downsized phases, delays (online date moved) and cancellations, each with its source
RowsOne row per campus phase or lease: company, bucket, site, country, grid, MW (IT and facility), status, announced date, online date, landlord or provider, confidence and source links
LeasesWho leases from whom (tenant and provider), counted once
CoverageFor each company, how much of its footprint has a disclosed MW, a third-party estimate, or nothing
MethodHow every figure is built, and what is estimated versus disclosed

When a company announces something large (500 MW or more), full-tracker licensees get a short note within two business days, folded into the next release.

Ground rules

The Energy Report (optional)

A companion report on the power behind each tracked site, delivered monthly with the tracker.

TabContent
SummaryBy company: sites with a named utility, grid capacity secured, on-site generation MW by type, site power contracts
SitesFor each site: serving utility, grid or ISO, interconnection status, grid capacity contracted or approved (and what that figure is), on-site generation, site power contracts, and one line on how the site is powered
Grid supplyEach contracted or approved grid service once, for example a utility supply agreement or a regulator-approved maximum demand
On-site generationEach plant once: gas turbines, engines, fuel cells, batteries, solar, with MW, owner and status
Site power contractsPower purchase agreements and similar deals tied to a named site

The same ground rules apply. Sources are utility and regulator filings, interconnection queues, air permits, developer releases and reputable press, and every fact links to its source. Renewable contracts a company signs for its whole portfolio are listed separately and not attached to a site unless a source ties them to it. Grid figures are contracted or approved supply, not the site's load.

The Power Contracts Tracker

Every power purchase agreement and supply contract signed by data-center buyers worldwide: hyperscalers, colocation operators, neoclouds, AI labs and the miners turning into AI hosts. All technologies: solar, wind, storage, gas, existing nuclear, SMR and advanced nuclear, geothermal, hydro, and supply agreements with utilities. Available on its own or with the tracker.

TabContent
SummaryMW contracted by technology and year signed, by the year it starts delivering, and by buyer; grid supply shown on its own line
RowsOne row per contract or tranche: buyer, seller, project, technology, MW and its basis, signed date, delivery date, term, country and grid, status, price where public, sources, and whether it counts and why
PricesEvery contract with a public price, from a party, a regulator or FERC Electric Quarterly Reports
FERC contractsEach US wholesale contract that sellers report to FERC with these buyers: signed date, term, volumes and volume-weighted price, matched to the plant behind it
CoverageFor each buyer, how many contracts have a public MW, signing date, delivery date, term and price, and how many have been checked
MethodWhat counts, how MW is stated, and where every price comes from

Licence options

Internal use

The full tracker, or the hyperscale bucket alone, for the named research team that signs the order form. Use across the wider firm is quoted separately.

Publication rights

Everything in internal use, plus the right to quote figures, charts and summary tables in your published research and client materials, attributed "Source: DC Hub (dchub.cloud)".

Energy report add-on

The Energy Report for every site in the tracker you license, under the same licence. Available with either option.

Pricing on request.

Request a proposal and sample data

Tell us who you cover and which datasets you want. We prepare a proposal and a sample cut for your firm.

Which datasets?

We'll reply within one business day with a proposal and sample data prepared for your firm.

Your request goes to Jonathan Martone at DC Hub (jonathan@dchub.cloud) and is kept to answer it. See our privacy policy.