A monthly spreadsheet of every data-center campus and phase that the world's hyperscalers, neoclouds and AI companies have operating, under construction or announced, with the month each one comes online. Built for sell-side and buy-side analysts.
This is a research dataset. To buy or lease data-center capacity, register your requirement on Capacity Source; to list capacity you have, see list your site.
Hyperscale: Microsoft, Amazon (AWS), Google, Meta, Oracle, plus Apple, ByteDance, Alibaba and Tencent where public sources allow. Neocloud: CoreWeave, Nebius, Crusoe, Lambda, Nscale, IREN, Fluidstack and other GPU clouds above 50 MW. AI: OpenAI, Anthropic, xAI, Mistral and other model developers with dedicated capacity. Others on request.
Capacity a company rents is credited to the company that uses it, and shown as supply under the company that provides it. If a hyperscaler leases from a neocloud, the MW appears in the tenant's total and in the provider's supply, and the grand total counts it once.
Every release ships as an Excel workbook, CSV files and a change log in the first business week of each month. Campuses and phases of 20 MW or more, plus any smaller site a company has announced itself.
| Tab | Content |
|---|---|
| Summary | Operating MW and MW coming online, by company and by bucket, by month and quarter |
| Coming online | Month-by-month schedule for the next 24 months, from developers' stated targets |
| Changes this month | New sites, upsized or downsized phases, delays (online date moved) and cancellations, each with its source |
| Rows | One row per campus phase or lease: company, bucket, site, country, grid, MW (IT and facility), status, announced date, online date, landlord or provider, confidence and source links |
| Leases | Who leases from whom (tenant and provider), counted once |
| Coverage | For each company, how much of its footprint has a disclosed MW, a third-party estimate, or nothing |
| Method | How every figure is built, and what is estimated versus disclosed |
When a company announces something large (500 MW or more), full-tracker licensees get a short note within two business days, folded into the next release.
A companion report on the power behind each tracked site, delivered monthly with the tracker.
| Tab | Content |
|---|---|
| Summary | By company: sites with a named utility, grid capacity secured, on-site generation MW by type, site power contracts |
| Sites | For each site: serving utility, grid or ISO, interconnection status, grid capacity contracted or approved (and what that figure is), on-site generation, site power contracts, and one line on how the site is powered |
| Grid supply | Each contracted or approved grid service once, for example a utility supply agreement or a regulator-approved maximum demand |
| On-site generation | Each plant once: gas turbines, engines, fuel cells, batteries, solar, with MW, owner and status |
| Site power contracts | Power purchase agreements and similar deals tied to a named site |
The same ground rules apply. Sources are utility and regulator filings, interconnection queues, air permits, developer releases and reputable press, and every fact links to its source. Renewable contracts a company signs for its whole portfolio are listed separately and not attached to a site unless a source ties them to it. Grid figures are contracted or approved supply, not the site's load.
Every power purchase agreement and supply contract signed by data-center buyers worldwide: hyperscalers, colocation operators, neoclouds, AI labs and the miners turning into AI hosts. All technologies: solar, wind, storage, gas, existing nuclear, SMR and advanced nuclear, geothermal, hydro, and supply agreements with utilities. Available on its own or with the tracker.
| Tab | Content |
|---|---|
| Summary | MW contracted by technology and year signed, by the year it starts delivering, and by buyer; grid supply shown on its own line |
| Rows | One row per contract or tranche: buyer, seller, project, technology, MW and its basis, signed date, delivery date, term, country and grid, status, price where public, sources, and whether it counts and why |
| Prices | Every contract with a public price, from a party, a regulator or FERC Electric Quarterly Reports |
| FERC contracts | Each US wholesale contract that sellers report to FERC with these buyers: signed date, term, volumes and volume-weighted price, matched to the plant behind it |
| Coverage | For each buyer, how many contracts have a public MW, signing date, delivery date, term and price, and how many have been checked |
| Method | What counts, how MW is stated, and where every price comes from |
The full tracker, or the hyperscale bucket alone, for the named research team that signs the order form. Use across the wider firm is quoted separately.
Everything in internal use, plus the right to quote figures, charts and summary tables in your published research and client materials, attributed "Source: DC Hub (dchub.cloud)".
The Energy Report for every site in the tracker you license, under the same licence. Available with either option.
Pricing on request.
Tell us who you cover and which datasets you want. We prepare a proposal and a sample cut for your firm.
We'll reply within one business day with a proposal and sample data prepared for your firm.
Your request goes to Jonathan Martone at DC Hub (jonathan@dchub.cloud) and is kept to answer it. See our privacy policy.