Northern Virginia data center power

As of Nov 17, 2026

Is grid power available for a data center in Northern Virginia? DC Hub's Data Center Power Index rates Ashburn AVOID for new data-center power, as of Nov 4, 2026, with a modelled time to power of over 48 months (a model band, not a utility date). Across the 6 Northern Virginia markets DC Hub scores, the verdicts are 6 AVOID. PJM's published generation interconnection queue is 373.5 GW as of Nov 17, 2026. Figures as of Nov 17, 2026.

DCPI verdicts across Northern Virginia

The verdict is DC Hub's Data Center Power Index (DCPI) reading for new data-center power: BUILD, CAUTION or AVOID. It describes the outlook for new power in the market, not the market's quality or size. The time to power is a modelled band, not a utility date. Each row is dated the day its verdict or scores last changed.

MarketDCPI verdictModelled time to power (band)Verdict and scores last changed
AshburnAVOIDover 48 monthsNov 4, 2026
SterlingAVOIDover 48 monthsNov 3, 2026
RestonAVOIDover 48 monthsNov 2, 2026
HerndonAVOIDover 48 monthsNov 2, 2026
ManassasAVOIDover 48 monthsNov 16, 2026
LeesburgAVOIDover 48 monthsNov 3, 2026

Source: DC Hub Data Center Power Index (DCPI).

Grid and utility facts

A queue measures requests for grid access. It is not spare capacity and it is not a forecast of what will be built.

ItemValue and date
Grid operatorPJM Interconnection, as of Nov 18, 2026
PJM generation interconnection queue373.5 GW as of Nov 17, 2026. Source: PJM cycle + serial service request status (active generation requests, sum of MFO)
Retail utilities serving the areaDominion Energy Virginia, Northern Virginia Electric Cooperative (NOVEC) (named in no order; a site is served by whichever utility's territory it sits in), as of Sep 30, 2026

What this page does not state

Sources and citing

Source: DC Hub (dchub.cloud), as of Nov 17, 2026. Upstream: DC Hub Data Center Power Index (DCPI); PJM cycle + serial service request status (active generation requests, sum of MFO); Utility territory: Loudoun County's utilities page, NOVEC's about page and the Virginia SCC regulated-companies service map.