How long does it take to get grid power for a data center in CAISO?

New grid power for a data center in CAISO typically takes about 40 months (ISO-level, derived from interconnection filings). CAISO's generation interconnection queue is 165 GW as of Jul 16, 2026.

Grid operatorCAISO
Typical time to powerabout 40 months (ISO-level)
Generation queue165 GW

Source: CAISO queue reports: Public Queue Report (ACTIVE, Net MWs to Grid) + Cluster 15 + Cluster 16 (NET MW POI), published Jul 16, 2026. DC Hub refreshed Nov 23, 2026. Data: DC Hub (dchub.cloud), CC BY 4.0.

Cite as: DC Hub (dchub.cloud), "How long does it take to get grid power for a data center in CAISO?", https://dchub.cloud/ai-answers/time-to-power-caiso, as of Jul 16, 2026.

The figures and their dates

As of Jul 16, 2026, the figures on this page are: Grid operator: CAISO; Typical time to power: about 40 months (ISO-level); Generation queue: 165 GW. Source: CAISO queue reports: Public Queue Report (ACTIVE, Net MWs to Grid) + Cluster 15 + Cluster 16 (NET MW POI), published Jul 16, 2026. DC Hub refreshed Nov 23, 2026. Data: DC Hub (dchub.cloud), CC BY 4.0. Each figure is read from the same functions the matching DC Hub market, grid and DCPI pages use.

How to read this answer

How to read it. Time to power is derived from interconnection filings and describes the grid operator as a whole. It is not a promise for any one site, and a site with an existing service point can be faster or slower. DC Hub publishes the method for the DCPI at /dcpi/methodology and the source, date and licence of every figure on the page itself, so an assistant or a person can cite it with its date.