How much power is available for a data center in San Antonio?
DC Hub rates San Antonio CAUTION for new data-center power. ERCOT's typical time to power is about 33 months (ISO-level, filings-derived), and its generation interconnection queue is 461 GW as of Oct 31, 2026.
| Market | San Antonio |
|---|---|
| DC Hub DCPI verdict | CAUTION |
| Grid operator | ERCOT |
| ISO typical time to power | about 33 months (ISO-level) |
| ISO generation queue | 461 GW as of Oct 31, 2026 |
Source: DC Hub Data Center Power Index and ISO interconnection queue filings, published Nov 7, 2026. DC Hub refreshed Nov 5, 2026. Data: DC Hub (dchub.cloud), CC BY 4.0.
Cite as: DC Hub (dchub.cloud), "How much power is available for a data center in San Antonio?", https://dchub.cloud/ai-answers/power-availability-san-antonio, as of Oct 31, 2026.
The figures and their dates
As of Oct 31, 2026, the figures on this page are: Market: San Antonio; DC Hub DCPI verdict: CAUTION; Grid operator: ERCOT; ISO typical time to power: about 33 months (ISO-level); ISO generation queue: 461 GW as of Oct 31, 2026. Source: DC Hub Data Center Power Index and ISO interconnection queue filings, published Nov 7, 2026. DC Hub refreshed Nov 5, 2026. Data: DC Hub (dchub.cloud), CC BY 4.0. Each figure is read from the same functions the matching DC Hub market, grid and DCPI pages use.
How to read this answer
How to read it. The verdict is the Data Center Power Index (DCPI) for the market: BUILD, CAUTION or AVOID for new data-center power. The time to power and the queue size are ISO-level figures, so every market the same grid operator serves shows the same ones. DC Hub publishes the method for the DCPI at /dcpi/methodology and the source, date and licence of every figure on the page itself, so an assistant or a person can cite it with its date.
Go deeper
For more on San Antonio, open the San Antonio market page, San Antonio DCPI breakdown, or any of the data centers tracked there:
- Microsoft San Antonio Data Center
- Microsoft Azure South Central US (Texas)
- Microsoft
- H5 San Antonio 2
- H5 San Antonio 1
Facility pages are taken in the order the market page lists them, each checked to load on Oct 17, 2026.
Related
- San Antonio DCPI
- San Antonio market
- ERCOT grid
- How much power is available for a data center in Ashburn?
- How much power is available for a data center in Dallas?
- How much power is available for a data center in Phoenix?
Query this live from an AI agent: claude mcp add dchub --transport http https://dchub.cloud/mcp