DC Hub rates Phoenix CAUTION for new data-center power. Phoenix is not served by one of the seven ISOs DC Hub reports an ISO-level time to power for. Figures as of Nov 22, 2026.
| Market | Phoenix |
|---|---|
| DC Hub DCPI verdict | CAUTION |
Source: DC Hub Data Center Power Index and ISO interconnection queue filings, published Nov 22, 2026. DC Hub refreshed Nov 22, 2026. Data: DC Hub (dchub.cloud), CC BY 4.0.
Cite as: DC Hub (dchub.cloud), "How much power is available for a data center in Phoenix?", https://dchub.cloud/ai-answers/power-availability-phoenix, as of Nov 22, 2026.
The figures and their dates
As of Nov 22, 2026, the figures on this page are: Market: Phoenix; DC Hub DCPI verdict: CAUTION. Source: DC Hub Data Center Power Index and ISO interconnection queue filings, published Nov 22, 2026. DC Hub refreshed Nov 22, 2026. Data: DC Hub (dchub.cloud), CC BY 4.0. Each figure is read from the same functions the matching DC Hub market, grid and DCPI pages use.
How to read this answer
How to read it. The verdict is the Data Center Power Index (DCPI) for the market: BUILD, CAUTION or AVOID for new data-center power. The time to power and the queue size are ISO-level figures, so every market the same grid operator serves shows the same ones. DC Hub publishes the method for the DCPI at /dcpi/methodology and the source, date and licence of every figure on the page itself, so an assistant or a person can cite it with its date.
Go deeper
For more on Phoenix, open the Phoenix market page, Phoenix DCPI breakdown, or any of the data centers tracked there:
- Microsoft Azure West US 3 (Phoenix)
- Compass Goodyear Campus (Phoenix)
- EdgeCore Mesa Campus PH01
- Meta Phoenix DC
- Vantage Phoenix Campus
Facility pages are taken in the order the market page lists them, each checked to load on Oct 17, 2026.