Phoenix or Las Vegas for a data center?
DC Hub rates Phoenix CAUTION and Las Vegas CAUTION for new data-center power. Figures as of Nov 24, 2026.
| Market | Phoenix | Las Vegas |
|---|---|
| DCPI verdict | CAUTION | CAUTION |
| Operational (verified sites) | 2,341 MW | 280 MW |
| Under construction (verified sites) | 557 MW | 100 MW |
| Planned (verified sites) | 0 MW | 50 MW |
| All tracked sites that report MW | about 4,323 MW | about 560 MW (floor) |
Source: DC Hub Data Center Power Index, published Nov 24, 2026. DC Hub refreshed Nov 24, 2026. Data: DC Hub (dchub.cloud), CC BY 4.0.
Cite as: DC Hub (dchub.cloud), "Phoenix or Las Vegas for a data center?", https://dchub.cloud/ai-answers/phoenix-vs-las-vegas-for-data-centers, as of Nov 24, 2026.
The figures and their dates
As of Nov 24, 2026, the figures on this page are: Market: Phoenix | Las Vegas; DCPI verdict: CAUTION | CAUTION; Operational (verified sites): 2,341 MW | 280 MW; Under construction (verified sites): 557 MW | 100 MW; Planned (verified sites): 0 MW | 50 MW; All tracked sites that report MW: about 4,323 MW | about 560 MW (floor). Source: DC Hub Data Center Power Index, published Nov 24, 2026. DC Hub refreshed Nov 24, 2026. Data: DC Hub (dchub.cloud), CC BY 4.0. Each figure is read from the same functions the matching DC Hub market, grid and DCPI pages use.
How to read this answer
How to read it. The comparison uses the same published verdicts and ISO-level figures as each market's own page, side by side. It ranks neither market above the other beyond what those figures state. DC Hub publishes the method for the DCPI at /dcpi/methodology and the source, date and licence of every figure on the page itself, so an assistant or a person can cite it with its date.
Go deeper
For more on Phoenix and Las Vegas, open the Phoenix market page, Phoenix DCPI breakdown, Las Vegas market page, Las Vegas DCPI breakdown, or any of the data centers tracked there:
- Microsoft Azure West US 3 (Phoenix)
- Compass Goodyear Campus (Phoenix)
- EdgeCore Mesa Campus PH01
- Switch Las Vegas SuperNAP
- Switch SuperNAP
Facility pages are taken in the order the market page lists them, each checked to load on Oct 17, 2026.