What is the Data Center Power Index verdict for Ellendale?

DC Hub's Data Center Power Index rates Ellendale AVOID for new data-center power, with a composite score of 33.5 out of 100, as of Nov 22, 2026. Ellendale is on the MISO grid.

MarketEllendale
State or regionND
Grid operatorMISO
DCPI verdictAVOID
DCPI composite score33.5 of 100
Verdict and scores last changedNov 22, 2026
Bismarck, ND (MISO)AVOID
Fargo, ND (MISO)AVOID
Williston, ND, ND (MISO)BUILD
Altoona, IA (MISO)AVOID
Baton Rouge, LA (MISO)CAUTION

Source: DC Hub Data Center Power Index (DCPI), published Nov 22, 2026. DC Hub refreshed Nov 23, 2026. Data: DC Hub (dchub.cloud), CC BY 4.0.

Cite as: DC Hub (dchub.cloud), "What is the Data Center Power Index verdict for Ellendale?", https://dchub.cloud/ai-answers/dcpi-verdict-ellendale, as of Nov 22, 2026.

The figures and their dates

As of Nov 22, 2026, the figures on this page are: Market: Ellendale; State or region: ND; Grid operator: MISO; DCPI verdict: AVOID; DCPI composite score: 33.5 of 100; Verdict and scores last changed: Nov 22, 2026; Bismarck, ND (MISO): AVOID; Fargo, ND (MISO): AVOID; Williston, ND, ND (MISO): BUILD; Altoona, IA (MISO): AVOID; Baton Rouge, LA (MISO): CAUTION. Source: DC Hub Data Center Power Index (DCPI), published Nov 22, 2026. DC Hub refreshed Nov 23, 2026. Data: DC Hub (dchub.cloud), CC BY 4.0. Each figure is read from the same functions the matching DC Hub market, grid and DCPI pages use.

How to read this answer

How to read it. The verdict is the Data Center Power Index (DCPI) for the market: BUILD, CAUTION or AVOID for new data-center power, recomputed daily from grid data and interconnection queues. The composite is a 0 to 100 buildability score; it can be compared with other DCPI scores, and it is not a capacity or a percentage. The other markets listed are ones DC Hub scores on the same grid operator, each with its own verdict. The date is the day the data on this page last changed. DC Hub publishes the method for the DCPI at /dcpi/methodology and the source, date and licence of every figure on the page itself, so an assistant or a person can cite it with its date.

Go deeper

For more on Ellendale, open the Ellendale market page, Ellendale DCPI breakdown, or any of the data centers tracked there:

Facility pages are taken in the order the market page lists them, each checked to load on Oct 17, 2026.