PARTNER MARKET BRIEF · 2026-10-27

Ashburn: power outlook

Data: DC Hub (dchub.cloud), as of 2026-10-27

AVOIDDCPI verdict · receipt
19.6DCPI composite score, of 100 · receipt
PJMgrid operator · receipt
374.2 GWPJM Active generation interconnection queue · receipt

What this means

The Data Center Power Index (DCPI) rates Ashburn AVOID, with a composite score of 19.6 out of 100, as of 2026-10-27.

The DCPI verdict (BUILD / CAUTION / AVOID) describes the outlook for new power in this market, from its excess-power and grid-constraint scores; it is not a judgement of the market's quality, size or demand.

The score drew on 2 of 2 live grid layers (interconnection queue, planned generators). 3 of its inputs are live and 5 are modeled; the receipt labels each one.

PJM Active generation interconnection queue: 374.2 GW as of 2026-10-27.

The DCPI reading

FigureValueAs ofSourceReceipt
DCPI verdict (BUILD / CAUTION / AVOID)AVOID2026-10-27DC Hub Data Center Power Index (DCPI)CC BY 4.0Receipt
DCPI composite score19.62026-10-27DC Hub Data Center Power Index (DCPI)CC BY 4.0Receipt
Grid operatorPJM2026-10-27DC Hub Data Center Power Index (DCPI)CC BY 4.0Receipt

Grid and grid-operator context

FigureValueAs ofSourceReceipt
PJM Active generation interconnection queueActive serial + Transition Cycle (TC1/TC2) + Cycle 1 generation requests, sum of MFO (maximum facility output, not firm MW capacity); excludes transmission-service requests, In Service and Withdrawn. Since 2026-10-20 this total includes PJM's Cycle 1 requests, which the serial export alone did not list (that is why it rose from ~135 GW); not a PJM refresh374.2 GW2026-10-27PJM cycle + serial service request status (active generation requests, sum of MFO)CC BY 4.0CC BY 4.0 (DC Hub compilation of the operator's public queue)Receipt

Inputs to the score

Live: interconnection queue depth, interconnection queue wait, planned generation additions (next 12 months).

Modeled: behind-the-meter headroom, demand growth, queue approval rate, renewable curtailment, reserve margin. DC Hub analyst estimate - calibrated from published PJM Interconnection disclosures; not a per-market measurement.

Cite as: DC Hub (dchub.cloud), as of 2026-10-27