San Antonio data center market brief

Live · 1.1h fresh

Market Brief · CAUTIONDCPI score pending · Live as of 62% live coverage · 5/8 sections

At a Glance 2 of 3 KPIs live

Operational897 MWsum of the sites that report MW; most do not
Pipeline0 MW
FacilitiesGlobal facility map
Queue WaitNot tracked
Top OperatorMicrosoft

Power & Grid 4 of 5 metrics live

ISOERCOT
Queue Capacity458,207 MW
Queue WaitNot tracked
Reserve Margin13.5%
Gen Additions 12mo19,641 MW
Interconnect Pending438,874 MW

Pipeline Coverage building

Coverage building for pipeline projects
We will surface live pipeline projects data here as soon as our facility (under-construction + planned) crawl returns rows for San Antonio. Full coverage typically lands within ~6 months of a market joining the DCPI.

Operator Footprint 5 operators tracked

OperatorFacilitiesTotal MW
Microsoft12750 MW
CyrusOne957 MW
Vantage Data Centers40 MW
H5 Data Centers375 MW
Amazon Web Services20 MW

M&A Activity (24mo) Coverage building

Coverage building for M&A activity (24mo)
We will surface live M&A activity (24mo) data here as soon as our deals-tracker crawl returns rows for San Antonio. Full coverage typically lands within ~6 months of a market joining the DCPI.

Comps Coverage building

Coverage building for powered-shell and land comps
We will surface live powered-shell and land comps data here as soon as our transaction-tracker crawl returns rows for San Antonio. Full coverage typically lands within ~6 months of a market joining the DCPI.

Risk Factors 1 of 2 signals live

12-Month Outlook

San Antonio's data center market comprises 82 tracked facilities spanning 1,797 MW across operational, under-construction, and planned assets. Microsoft leads the operator landscape with 12 facilities, followed by CyrusOne with 9 and Vantage Data Centers with 4. The market has attracted sufficient capital to sustain active development, with Texas Research Park emerging as a regional hub for colocation and enterprise infrastructure.

The CAUTION verdict reflects a market in tension between growth momentum and infrastructural headroom. With an excess-power score of 55/100, San Antonio retains meaningful capacity buffer—the market is neither oversupplied nor critically constrained. However, the constraint score of 59/100 signals that power delivery and transmission infrastructure are tightening relative to pipeline demand. For acquisition-focused investors, this configuration suggests selective opportunity: entry points exist for buyers with near-term operational targets, but large-scale portfolio accumulation carries elevated execution risk if power augmentation lags development timelines. Operators already entrenched—particularly Microsoft's 12-facility footprint—benefit from grandfathered interconnection rights and established utility relationships that newer entrants may lack.

Deal flow into San Antonio has stalled at the tracked level, with no recent M&A recorded. This absence is material: it signals either saturation among existing operator portfolios, hesitation among acquisition-focused funds awaiting power infrastructure clarity, or both. The operator concentration favors incumbents; Microsoft and CyrusOne control 21 of 82 facilities, reducing available assets for secondary acquisition. Smaller operators like Vantage with 4 facilities remain potential targets, but the dry deal environment suggests pricing expectations or power availability concerns are misaligned between buyers and sellers.

Forward momentum depends on whether municipal and utility-scale power investments outpace the 1,797 MW pipeline; if not, the constraint score will likely drift higher, converting CAUTION into AVOID for new entrants.

Share on X Share on LinkedIn Copy URL Embed this brief Download PDF
DC Hub · https://dchub.cloud/markets/san-antonio/brief · Live as of