Power availability in Piscataway Township: DCPI verdict AVOID, composite score 22.7 of 100, as of 2026-11-07. Source: DC Hub.
Data Center Market Deep-Dive · 302 words · generated 2026-11-05 from live DC Hub data · DCPI live as of 2026-11-07
Piscataway Township has 28 MW operational among the verified sites DC Hub lists that report capacity, as of 2026-11-07. By listed capacity the largest operators are Digital Realty (28 MW).
| Status | MW |
|---|---|
| Operational | 28 |
| Total listed | 28 |
Source: DC Hub (dchub.cloud), facility records as of 2026-11-07. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.
DC Hub does not hold a lease-rate figure for this market yet.
Any new facility development would face multi-year interconnection timelines and potential utility upgrade costs that compress margins.
Deal flow in Piscataway remains inert. No recent transactions have been tracked, and the operator base shows no consolidation signals. Digital Realty's two-facility footprint establishes a weak anchor, insufficient to drive competitive tension or capital velocity. The broader Central New Jersey region—particularly Bridgewater Township and South Brunswick—has faced organized community opposition to large data center proposals, which may suppress future deal activity in adjacent municipalities including Piscataway.
Piscataway will remain a second-wave acquisition target only after its power infrastructure upgrades materialize—a timeline unlikely to compress below three to five years given current grid utilization and utility capex cycles.
| Facility | Operator | Status | MW |
|---|---|---|---|
| Digital Realty New York EWR11 | Digital Realty | Operational | 14 |
| Digital Realty New York EWR12 | Digital Realty | Operational | 14 |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in New Jersey.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
Piscataway Township: 28 MW tracked, any status — live, cited, and queryable by API or MCP.
JSON: /api/v1/markets/piscataway-township/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-05, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load