Power availability in Midlothian, TX: DCPI verdict CAUTION, composite score 45.5 of 100, as of 2026-11-18. Source: DC Hub.
Data Center Market Deep-Dive · 182 words · generated 2026-11-17 from live DC Hub data · DCPI live as of 2026-11-18
Midlothian, TX has 300 MW operational and 125 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-11-18. By listed capacity the largest operators are Google (425 MW).
| Status | MW |
|---|---|
| Operational | 300 |
| Under construction | 125 |
| Total listed | 425 |
| Operator | Under construction MW | Planned MW |
|---|---|---|
| 125 |
Source: DC Hub (dchub.cloud), facility records as of 2026-11-18. Verified sites that report MW only; blank means no MW reported. The "MW, all listings" tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it can be larger than Total listed.
DC Hub does not hold a lease-rate figure for this market yet.
Google operates 2 of these sites.
The DCPI verdict for Midlothian is CAUTION. Neither signal is currently present. Any new major load on this grid would immediately breach safe operating thresholds.
Deal activity in Midlothian remains dormant—no recent transactions are tracked. This absence reflects the tight power position: operators cannot easily absorb new megawatt commitments without grid reinforcement.
| Facility | Operator | Status | MW |
|---|---|---|---|
| Google Midlothian Data Center | Operational | 300 | |
| Google Midlothian Building 3 | Under Construction | 125 |
Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.
Browse every data center in Texas.
Looking for an offer? Find data center capacity to buy or lease. Market facility totals describe tracked infrastructure, not currently authorized available offers. Check each listing’s scope, freshness, delivery schedule and operator approval.
Control a site or capacity? List operator-controlled capacity for review. DC Hub complements your existing research and procurement tools with data center and energy intelligence.
Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).
Midlothian, TX: 425 MW tracked, any status — live, cited, and queryable by API or MCP.
JSON: /api/v1/markets/midlothian/deep-dive · DCPI: /dcpi · Operators: /operators · Narrative written 2026-11-17, refreshed on a rolling schedule (about monthly per market); the DCPI score, MW total and facility records above are read live at page load