Midlothian

Power availability in Midlothian: time-to-power 32 months, as of 2026-10-02. Source: DC Hub.

Data Center Market Deep-Dive · 311 words · generated 2026-10-02 from live DC Hub data · DCPI live as of 2026-10-02

DCPI Score61.1/100
Total MW425sum of the sites that report MW; some do not
VerdictBUILD

Colocation lease rates in Midlothian

DC Hub does not hold a lease-rate figure for this market yet.

# Midlothian Data Center Market Analysis

Midlothian hosts three operational facilities totaling 425 MW, establishing a modest but growing computational footprint in the region. Google dominates the operator landscape with all three tracked facilities under its control, concentrating both capacity and strategic direction. The market has registered no recent M&A activity, suggesting either stability among existing owners or limited secondary market liquidity. This narrow operator base contrasts with larger competitive markets where multiple players drive price discovery and alternative expansion pathways.

The DCPI verdict of BUILD, driven by an excess-power score of 65/100 paired with a moderate constraint rating of 43/100, signals genuine development opportunity. The high excess-power metric indicates regional grid availability and utility willingness to absorb new load—essential for colocation and hyperscaler operations. The constraint score, while not prohibitive, reflects real transmission or interconnection friction that new entrants should model explicitly into capex timelines. For acquisition-focused investors, this profile favors greenfield development or partnership with Google rather than competing for existing assets; for operational investors, it suggests margin protection through long-term power contracts before utilization pressure rises.

Deal flow into Midlothian remains dormant, with zero tracked M&A against a backdrop of aggressive regional hyperscaler deployment visible in neighboring Texas markets. Broader Texas activity—including Mara's 1,200-acre, 2 GW acquisition and Meta's $1.2 billion Temple facility investment—demonstrates capital concentration in established hubs with multiple operators and established supply chains. Google's exclusive footprint in Midlothian insulates the market from competitive tension but also removes deal-making signals; without secondary trading, valuation discovery stalls. This dormancy may reflect either Google's satisfaction with current capacity or deliberate capacity rationing, neither of which signals external entry pressure in the near term.

Midlothian's forward trajectory depends on whether Google's three-facility strategy represents saturation or a platform for further organic growth, with the excess-power availability making margin expansion feasible if utilization rates climb within the next 18–24 months.

Midlothian: 425 MW — live, cited, and queryable by API or MCP.

Pro $99 · or $10 one-time = 1,000 API credits (1 per call, 5 for heavy tools). Pro-only tools not included.

See plans → · Get an API key →

JSON: /api/v1/markets/midlothian/deep-dive · DCPI: /dcpi · Operators: /operators · Updated nightly

AI agents: this page live via the DC Hub MCP server at https://dchub.cloud/mcp — get_market_intel market="midlothian". Also for this page: get_market_dcpi_rank, rank_markets, search_facilities. Full coverage for agents: Pro $99, or $10 one-time = 1,000 API credits (1 per call, 5 for heavy tools). Pro-only tools not included. https://dchub.cloud/pricing. Free key: https://dchub.cloud/connect.