Los Angeles data center market brief

Live · 1.5h fresh

Market Brief · CAUTIONDCPI score pending · Live as of 75% live coverage · 6/8 sections

At a Glance 2 of 3 KPIs live

Operational383 MWsum of the sites that report MW; most do not
Pipeline0 MW
FacilitiesGlobal facility map
Queue WaitNot tracked
Top OperatorEquinix

Power & Grid 4 of 5 metrics live

ISOCAISO
Queue Capacity131,543 MW
Queue WaitNot tracked
Reserve Margin17.0%
Gen Additions 12mo7,828 MW
Interconnect Pending164,942 MW

Pipeline 1 projects tracked

OperatorFacilityPowerStatusETA
Arcadian InfracomArcadian Infracom Los Angeles PoPNot trackedUnder ConstructionNot tracked

Operator Footprint 5 operators tracked

OperatorFacilitiesTotal MW
Equinix780 MW
Digital Realty674 MW
CoreSite670 MW
Colocation America Corporation50 MW
Enzu40 MW

M&A Activity (24mo) Coverage building

Coverage building for M&A activity (24mo)
We will surface live M&A activity (24mo) data here as soon as our deals-tracker crawl returns rows for Los Angeles. Full coverage typically lands within ~6 months of a market joining the DCPI.

Comps Coverage building

Coverage building for powered-shell and land comps
We will surface live powered-shell and land comps data here as soon as our transaction-tracker crawl returns rows for Los Angeles. Full coverage typically lands within ~6 months of a market joining the DCPI.

Risk Factors 2 of 2 signals live

12-Month Outlook

Los Angeles operates 209 tracked facilities totaling 303 MW across operational, under-construction, and planned sites. Equinix leads with 7 facilities, followed by CoreSite and Digital Realty at 6 each, with Colocation America Corporation and Enzu operating 5 and 4 sites respectively. The market shows fragmentation typical of mature metropolitan regions, with no single operator commanding dominant share.

Deal flow has stalled—no recent transactions are tracked in Los Angeles. This dormancy occurs against a backdrop of elevated M&A velocity in adjacent California metros and national private-equity interest in data center platforms. The absence of recent activity likely reflects incumbent operator satisfaction with current positions, or market participants awaiting clarity on power infrastructure timelines. Equinix's 7-facility footprint provides the largest operational anchor, while the five-operator concentration among top participants suggests entrenched competitive positioning and high barriers to new entrant acquisition.

Power procurement timelines will determine whether Los Angeles attracts new capital deployment in the near term.

Share on X Share on LinkedIn Copy URL Embed this brief Download PDF
DC Hub · https://dchub.cloud/markets/los-angeles/brief · Live as of