Irving data center market

Power availability in Irving: DCPI verdict CAUTION, composite score 49.7 of 100, as of 2026-10-20. Source: DC Hub.

Data Center Market Deep-Dive · 337 words · generated 2026-10-19 from live DC Hub data · DCPI live as of 2026-10-20

DCPI Score49.7/100
Total MW661sum of the sites that report MW; most do notany status, unverified listings included
VerdictCAUTION

Irving at a glance

Irving has 330 MW operational and 201 MW under construction among the verified sites DC Hub lists that report capacity, as of 2026-10-20. By listed capacity the largest operators are QTS (330 MW) and PowerHouse Data Centers (201 MW).

Capacity by status, as of 2026-10-20
StatusMW
Operational330
Under construction201
Total listed531

Developers building or planning in Irving

OperatorUnder construction MWPlanned MW
PowerHouse Data Centers201

Source: DC Hub (dchub.cloud), facility records as of 2026-10-20. Verified sites that report MW only; blank means no MW reported. The Total MW tile above is a wider measure (every tracked site that reports MW, any status, unverified directory listings included), so it is larger than Total listed.

Colocation lease rates in Irving

DC Hub does not hold a lease-rate figure for this market yet.

Irving's data center market holds 661 MW across tracked facilities, establishing it as a meaningful regional hub, yet power dynamics reveal structural tension. QTS and its affiliates operate a majority stake in tracked capacity (7 of facilities), concentrating market influence among a single operator family and leaving Irving vulnerable to single-entity capital allocation shifts.

The DCPI verdict of CAUTION warrants specific operational scrutiny from acquisition-focused investors. For buyers, this signals elevated capex risk on interconnection timelines and potential revenue drag during ramp periods. The excess-power reading, while positive, does not offset constraint-side friction—investors should model extended pre-revenue periods and factor in Texas grid reliability volatility.

Deal flow remains dormant; no recent M&A tracked in Irving contrasts sharply with hyperscale capital flooding broader Texas. Meta's $1.2 billion Temple, Texas investment and multi-billion dollar acquisitions in the state (Aligned's $40 billion deal, Mara's 2GW campus play, and BlackRock-backed financing of $12 billion-plus facilities) reflect investor appetite for Texas, yet Irving has not captured meaningful institutional capital deployment. This silence likely reflects the constraint ceiling: operators already deployed in Irving (QTS family, PowerHouse Data Centers, Quality Technology Services) are extracting returns from existing footprints rather than expanding, and external capital sees limited incentive to compete for interconnection slots in a constrained market. The absence of regional consolidation or platform acquisition activity suggests Irving occupies an awkward middle tier—too mature for greenfield venture interest, too capacity-constrained for aggressive buyout expansion.

Data centers in Irving

FacilityOperatorStatusMW
PowerHouse Irving (Las Colinas)PowerHouse Data CentersUnder Construction201
QTS Irving Mega CampusQTSOperational200
QTS DallasQTSOperational130
QTS Dallas Fort Worth TX DCQTS RealtyOperational
QTS Irving - Dallas (DFW1)QTSOperational
QTS Irving - Dallas Data Center CampusQTS RealtyOperational

Largest first by reported MW (blank where not reported). Unverified directory listings are not shown.

Browse every data center in Texas.

More on Irving

Email me when the Irving DCPI verdict changes

Ask your agent: connect https://dchub.cloud/mcp (no key needed for previews).

Irving: 661 MW tracked, any status — live, cited, and queryable by API or MCP.

Pro $99 · or $10 one-time = 1,000 API credits (1 per call, 5 for heavy tools). Pro-only tools not included.

Unlock full market data → · Get an API key →

JSON: /api/v1/markets/irving/deep-dive · DCPI: /dcpi · Operators: /operators · Updated nightly