Fort Worth data center market brief

Live · 1.1h fresh

Market Brief · CAUTIONDCPI score pending · Live as of 88% live coverage · 7/8 sections

At a Glance 2 of 3 KPIs live

Operational1,834 MWsum of the sites that report MW; most do not
Pipeline1,624 MW
FacilitiesGlobal facility map
Queue WaitNot tracked
Top OperatorQTS Realty

Power & Grid 4 of 5 metrics live

ISOERCOT
Queue Capacity458,207 MW
Queue WaitNot tracked
Reserve Margin13.5%
Gen Additions 12mo19,641 MW
Interconnect Pending438,874 MW

Pipeline 8 projects tracked

OperatorFacilityPowerStatusETA
Yondr GroupYondr Lancaster (Dallas Campus)550 MWPlannedNot tracked
Anthropic / FluidstackAnthropic Texas AI Campus300 MWPlannedNot tracked
Crow HoldingsCrow Holdings / CleanArc - Stemmons Corridor245 MWPlannedNot tracked
PowerHouse Data CentersPowerHouse Irving (Las Colinas)201 MWUnder ConstructionNot tracked
CoreWeaveCoreWeave Helios TX (Core Scientific)200 MWUnder ConstructionNot tracked
EdgedEdged Texas 180 MWUnder ConstructionNot tracked
QTSQTS DFW-348 MWUnder ConstructionNot tracked
Arcadian InfracomArcadian Infracom Dallas PoPNot trackedPlannedNot tracked

Operator Footprint 5 operators tracked

OperatorFacilitiesTotal MW
QTS Realty20 MW
Meta20 MW
Edged180 MW
CITIGROUP TECHNOLOGY INC10 MW
Cyxtera10 MW

M&A Activity (24mo) 4 deals tracked

DateBuyerSellerValueMW
2026-10-19StackNot tracked$540Not tracked
2026-09-30AmazonNot tracked$430Not tracked
2026-08-19QTSNot trackedNot tracked48 MW
2026-06-05CompassNot tracked$15Not tracked

Comps Coverage building

Coverage building for powered-shell and land comps
We will surface live powered-shell and land comps data here as soon as our transaction-tracker crawl returns rows for Fort Worth. Full coverage typically lands within ~6 months of a market joining the DCPI.

Risk Factors 1 of 2 signals live

12-Month Outlook

Fort Worth's data center ecosystem remains nascent but structurally constrained. The market hosts 21 tracked facilities under five primary operators, with QTS Realty and Meta each operating two sites; a $10 billion campus development has secured revised site plan approval from city officials, signaling municipal appetite for large-scale expansion. Power availability, the sector's primary bottleneck, registers at 56/100 on the excess-power index—below the safety threshold for unconstrained growth. Only one of the 21 tracked facilities publicly reports its megawatt capacity, underscoring the opacity typical of early-stage regional markets.

The DCPI verdict of CAUTION reflects genuine infrastructure risk rather than speculative overcapacity. A constraint score of 51/100 positions Fort Worth at the inflection point where demand outpaces grid headroom; operators cannot assume unlimited power hookup availability without negotiating directly with municipal utilities and transmission planners. For institutional buyers and build-to-suit developers, this means feasibility studies must front-load power procurement timelines and secure committed capacity before land acquisition or design finalization. The market rewards operators with existing utility relationships or sites pre-sited on secondary transmission corridors. Speculative development carries elevated permitting and timeline risk.

Deal flow remains dormant in recorded M&A; no announced acquisitions or sales have closed in Fort Worth proper in the tracked period. The $10 billion campus announcement represents a greenfield development commitment rather than operator consolidation, suggesting capital is flowing toward new construction rather than portfolio aggregation. Meta's dual presence and QTS's two-site footprint indicate selective geographic positioning by tier-one operators, though neither has announced recent acquisitions in the submarket. Alpheus Communications, Centersquare, and smaller entrants occupy narrower niches, and the absence of recent deals hints at either patient capital deployment or capacity constraints limiting M&A velocity.

Fort Worth's regulatory environment—approvals for the major campus, ongoing city evaluation of statewide audit implications, and competing interest in liquid-cooled facilities—will determine whether the CAUTION verdict moderates or hardens through 2026.